Healthcare construction is commercial building with the margin for error removed. Air pressure, medical gas, infection control and licensing rules apply from the first sketch. Most of the cost and delay risk is set in the first few months, before anyone breaks ground. The owners who finish on time and on budget put the designers and builders at one table early, and they bring the city in early as well. That is the design-build approach we use at Teamacs, and the rest of this article explains why it fits healthcare work.
TL;DR
- Healthcare projects add medical gas, pressure-controlled air, infection control and strict code review to ordinary commercial scope.
- A project moves through planning, design, bidding, construction and commissioning. Decisions in the first two phases shape the budget more than anything done on site.
- Expansions and renovations of working facilities need phasing and infection-control planning so patient care continues.
- Design-build puts design, cost and construction under one team. A national facilities association names it as one of three common delivery methods for healthcare.
- Ask any builder for healthcare experience, phasing plans and early coordination with municipal officials.
Table of Contents
- What makes healthcare construction different
- Which facilities count
- The phases of a healthcare project
- Codes and standards you will meet
- Building or renovating while care continues
- Controlling cost and schedule
- Defining scope and choosing a healthcare construction partner
- How Teamacs approaches healthcare projects
- FAQ
- Sources
What makes healthcare construction different
A warehouse and a surgery wing may both be “commercial,” but their systems have little in common. Three differences matter most to an owner.
Systems that interact. Procore’s hospital construction guide notes that specialty medical gas piping complicates the electrical, plumbing and HVAC design. It also notes that negative-pressure rooms use sealed HVAC systems, especially in operating rooms and isolation units. Each of these has to be coordinated with the others before walls close.
Work next to patients. Many healthcare projects are built beside a facility that stays open around the clock. The same guide describes walk-off mats and airtight barriers that keep dust and fumes out of occupied areas.

A long-lived asset. Peer-reviewed research in a SAGE journal observes that health systems tend to plan, build, own, operate and maintain their own facilities. That makes them more concerned than most developers with service life of systems and components. The same authors note that early design decisions can affect later medical outcomes.
The same article describes healthcare projects as involving hundreds of participants, thousands of products and systems, and tens of thousands of decisions. That is why one accountable team matters.
Which facilities count
The Joint Commission, a U.S. accreditor of health care organizations, lists the settings covered by its built-environment guidance:
- Ambulatory care: surgery centers, imaging centers, urgent care
- Hospitals, including academic medical centers and critical access hospitals
- Nursing care centers and assisted living communities
- Behavioral health facilities
- Laboratories and office-based surgery practices
- Rural health clinics
For Midwest developers, the most common starting points are medical office buildings, outpatient clinics, senior living and hospital additions. Our senior living facilities page covers that segment.
The phases of a healthcare project
The American Society for Health Care Engineering (ASHE) organizes its 2023 project management handbook into five parts: planning, design, bidding, construction and operational considerations. In practice the sequence looks like this.
- Planning. Define services, space needs, site, budget and the approval path. A Washington State project review shows how long this takes at scale. EvergreenHealth’s $170 million surgery expansion ran programming through 30% design from May to September 2025.
- Design. Layouts, systems and code compliance are resolved. This is where design-build earns its keep, because pricing runs alongside drawings.
- Bidding or pricing. Under traditional delivery, this is a separate step after design. Under design-build it is continuous.
- Construction. The same Washington project schedules construction from October 2026 to September 2027.
- Commissioning and closeout. Commissioning is the testing of building systems and clinical processes before patients arrive. The same project shows owner occupancy and commissioning running about two months after construction, with closeout continuing into March 2028.
The Joint Commission’s fifth edition says commissioning matters for both building systems and clinical workflows. It recommends test-driving equipment and simulating processes in realistic scenarios. HFM Magazine’s summary of the ASHE handbook adds that commissioning should be part of the conversation at every stage, not only the end.
Codes and standards you will meet
Healthcare owners work to several layers of rules at once: local building codes, state licensing and the standards of accreditors and guideline bodies.
- The Facility Guidelines Institute publishes the FGI Guidelines, which it describes as the most widely recognized guidance for planning, designing and constructing health care facilities. See its editions page for the current edition. The 2022 hospital edition added sections for a behavioral health crisis unit and a low-acuity patient treatment station.
- The CDC’s environmental infection control recommendations call for an infection-control risk assessment (ICRA) before construction. An ICRA is a structured review of how construction could expose patients to dust, mold spores and other airborne hazards. The CDC also recommends educating both the construction team and clinical staff about those risks.
- The Joint Commission’s fifth edition of its design and construction guide updates guidance on post-pandemic design, infection prevention, workplace violence and current FGI requirements.
Your state health department and local building official have the final word on which edition applies to your project. That is one reason early contact with municipal officials pays off.
Building or renovating while care continues
Most owners cannot close. The Pullman Regional Hospital approved a $24.8 million guaranteed maximum price for a $41 million, 33,000-square-foot remodel and addition. It was planned in three phases over three years, with the hospital open throughout.

Colorado’s Longs Peak Hospital shows what phasing looks like. As BizWest reported, the $55 million project added 46,500 square feet in Phase I, including two operating rooms, nine PACU bays and an expanded emergency department. Phase II added a central utility plant and infill space, and 28,200 square feet of existing departments were renovated.
The pattern is consistent:
- Build new space first so departments have somewhere to move.
- Renovate in sequence, one area at a time.
- Run an infection-control risk assessment before each phase.
- Plan service disruptions (power, water, medical gas shutdowns) with clinical staff in advance.
- Train staff and commission each phase before it opens.
A general contractor that handles design and construction management together can write this sequence into the schedule from day one.
Controlling cost and schedule
The ASHE handbook, as HFM Magazine reports, names three common healthcare delivery methods. They are integrated project delivery, an early-retained construction manager acting as cost consultant, and design-build. It adds that alternatives to traditional design-bid-build may deliver faster, more efficiently and at lower cost.
The handbook also lists what a healthcare budget should include beyond construction:
- Equipment and furnishings
- Architect, engineer and consultant fees
- Legal, broker, survey and soil investigation costs
- Filing and financing costs
- Contingency and escalation
- Technology and telecommunications
The EvergreenHealth example shows why this matters. Of the $170 million budget, $98 million was construction. Equipment and furnishings were $34 million, and sales tax was $10.09 million. A budget that covers only the building understates the real number by a wide margin.
Market movement is the other risk. The University of Iowa asked its regents to raise the budget for a North Liberty healthcare facility by 33%, from $395 million to $525.6 million, for the same 469,000-square-foot design. It cited inflation, material prices and labor shortages. Early pricing, escalation allowances and a guaranteed price fixed once design is far enough along are the tools that manage that exposure.
Our own list of common construction mistakes covers several of the budget and communication traps that apply here.
Defining scope and choosing a healthcare construction partner
Before you ask anyone for a price, settle these:
- Services and space program. Which departments, how many rooms, which equipment? Imaging, operating rooms and labs drive structural and mechanical needs.
- Site and approvals. Zoning, utilities and plan commission review take time. Developers of senior living or medical office space often need land and entitlements before design can finish.
- Occupied or vacant. If the building stays open, phasing and infection control become part of scope.
- Delivery method. Choose one team for design and construction, or separate contracts.
- Total project budget. Include equipment, fees, contingency and escalation, as above.
- Operations after opening. Who maintains the building and its systems for decades?
Then look at what a partner can show you: comparable projects, a plan for working around live operations, and a record of working with building officials and inspectors. A builder that also designs and manages facilities answers more of these questions without handoffs.
How Teamacs approaches healthcare projects
We are a family-owned design-build firm founded in 1980. Our designers and construction professionals work together from the start, coordinating scope and budget decisions, and we coordinate early with municipal officials. Owners deal directly with the people managing their project.
For healthcare, that means one team can take a clinic, medical office, addition or renovation from concept through construction. Our services include design-build construction, ground-up building, renovations, additions and tenant improvements, as well as architectural design and construction management. For land, acquisition and phased development, see our real estate development services. We also offer facility management after the building opens.

If you have a site, a plan commission note or a space need, start at teamacs.net and tell us what you are building.
FAQ
What is healthcare facility construction?
It is the design and building of spaces where patients receive care: hospitals, surgery and imaging centers, clinics, labs, behavioral health and senior living. These buildings must meet healthcare-specific standards for air, infection control, medical gas and life safety, on top of ordinary building codes.
How long does a healthcare construction project take?
It depends on size and phasing. A Washington State surgery expansion scheduled programming and design from May 2025, construction from October 2026 to September 2027, and closeout into March 2028. Smaller outpatient projects move faster, but planning and approvals still come first.
Is design-build a good fit for healthcare projects?
Yes. ASHE’s handbook names design-build as one of three common healthcare delivery methods, and reports that alternatives to design-bid-build can be quicker and less costly. A single team lets cost and schedule inform design from the start.
What is an infection-control risk assessment?
It is a structured review, recommended by the CDC before construction, of how the work could affect patients, especially immunocompromised patients. It sets the barriers, air controls and staff communication needed during the project.
Sources
- Hospital Construction: Managing Unique Challenges (Procore)
- Complex Healthcare Facility Management and Lean Construction (SAGE)
- Planning, Design, and Construction of Health Care Facilities, sample pages (Joint Commission)
- The Facilities Manager’s Handbook for Health Care Project Management (ASHE)
- EvergreenHealth project review (Washington State)
- ASHE draws blueprint for planning, design and construction (HFM Magazine)
- Planning, Design, and Construction of Health Care Facilities, 5th edition (Joint Commission)
- FGI Code/Guidelines editions
- Environmental infection control recommendations (CDC)
- Pullman Regional Hospital construction budget
- Longs Peak Hospital expansion (BizWest)
- University of Iowa North Liberty budget request